Mass and Structural Excavations.
HCA DAVIE GARAGE
March 2020
The HCA Davie Hospital Garage, this project was the completed in two phases the mass excavation and the structural excavation. The Hospital Garage posed specific challenges due to its reduced footprint, existing piles and structures to work around, and the aggressive schedule required to get the structure vertical. We successfully met our deadline and ensured the project progressed as planned.
The Numbers:
- 17,000 CY Mass Excavation
- 23,000 CY Structural Excavation